Case studies


 

Maine Tower at Harbour Central

Modebest Builders wanted a 2m deep, second floor transfer slab in the Maine Tower at their Harbour Central project in Canary Wharf.

View case study
Product: TOPFLOW SCC 85N/mm2

Client:  Modebest Builders Ltd
Location:  Harbour Central, Canary Wharf
Date of completion:  December 2016

Flood defence Ipswich

Volker Stevin needed a concrete solution that could be placed under the curved framework that would be forming the base of the Coffer Dam on the River Orwell in Ipswich.

View case study
Product: TOPFLOW SCC 60N/mm2

Client:  Suffolk County Council
Main contractor:  Volker Stevin
Location:  Ipswich
Date of completion:  October 2017

Harbour Central project in Canary Wharf

The total project required 52,000m3 of concrete solutions. Through planning, testing and collaboration the build was completed ahead of schedule.

View case study
Project: Groundwork and RC frames

Client:  Modebest Builders Ltd
Value:  £40.72M
Concrete value:  £6.0M
Duration:  June 2016 – May 2018

Arsenal youth training ground facilities

The client required a sub base to be placed under permeable block paving for a new car park.

View case study
Product: Topmix Permeable

Client:  JB Developments
Location:  Arsenal
Date of completion:  2017

For more information about Euromix Concrete: