Please use our concrete calculator to find out how much concrete you require.
Unless you have a credit facility with us the most convenient method of payment is by credit or debit card. Alternatively we will accept payment by cash on or before delivery.
In normal ambient temperatures you will normally only have between 1 and 2 hours to place, level and compact the concrete and to finish the surface.
During the summer the setting time will be shorter at higher temperatures and you will need to ensure that enough manpower is available to place, compact and finish the concrete within about 40 minutes of the commencement of placing the concrete.
Here is a list of the most common concrete applications and the advised designated concrete mix designs:
Blinding and mass fill concrete:
GEN1 or TOPFLOW self compacting concrete
Fully buried reinforced foundations:
RC25/30 or TOPFLOW self compacting concrete
Reinforced foundations with a DC class specified by an engineer:
DC-2 FND 2 or TOPFLOW self compacting concrete
DC-3 FND 3 or TOPFLOW self compacting concrete
DC-4 FND 4 or TOPFLOW self compacting concrete
House or garage floors, fully or nominally reinforced:
RC25/30 + Fibres or TOPFLOW self compacting concrete
Wearing surface (Slab) Light foot & trolley traffic:
RC25/30 or TOPFORCE fibre reinforced concrete
Wearing surface (Slab) General industrial:
RC32/40 or TOPFORCE fibre reinforced concrete
Wearing surface (Slab) Heavy Industrial:
RC40/50 or TOPFORCE fibre reinforced concrete
House & domestic drives, external parking:
RC40/50XF or TOPROC high strength concrete
Heavy duty external paving:
RC40/50XF or TOPROC high strength concrete