Thames Tideway, Deptford

24-hour Continuous Slipform Pour for 5 Days to Slipform Engineering on the Thames Tideway Deptford Project.

Harbour Central project in Canary Wharf

Scope: to provide RC basement slab, RC waterproofed cores and lift pits, RC pile caps, RC waterproofed basement slab and liner walls, RC shared podium transfer slab over the entire basement area.

Maine Tower at Harbour Central

Modebest Builders wanted a 2m deep, second floor transfer slab in the Maine Tower at their Harbour Central project in Canary Wharf.