Cann Hall Skate Park had been closed after the steel frame and plywood structure had fallen into disrepair. A refurbishment proposal was put together with funding from the Council’s Greenspace department, government funding secured by the Council’s youth service team and a donation from the local police Safer Neighbourhood Team.
Thames Tideway, Deptford
24-hour Continuous Slipform Pour for 5 Days to Slipform Engineering on the Thames Tideway Deptford Project.
Arsenal youth training ground facilities
The client required a sub base to be placed under permeable block paving, for a new car park.
Harbour Central project in Canary Wharf
Scope: to provide RC basement slab, RC waterproofed cores and lift pits, RC pile caps, RC waterproofed basement slab and liner walls, RC shared podium transfer slab over the entire basement area.
Flood Defence Ipswich
Volker Stevin needed a concrete solution that could be placed under the curved framework that would be forming the base of the Coffer Dam on the River Orwell in Ipswich.
Maine Tower at Harbour Central
Modebest Builders wanted a 2m deep, second floor transfer slab in the Maine Tower at their Harbour Central project in Canary Wharf.